• Address: Shahrah-e-Liaquat,
    Serai Quarters 74000, Karachi

  • Call Us: +92 319 3961178
    info@sshussain.com

Installation Services

S.S HUSSAIN & SONS

3rd Party Installation Services

Do you have a major project where the execution of your contract control panel business might make or break it? We are aware that occasionally your items might have to be used in conjunction with equipment from a third party. The quality of your Surface Safety Valve (SSV) or Surface Controlled Sub-Surface Safety Valve (SCSSV) and related equipment is crucial to the project, but so is the integrity of the control system.

Your professional, unbiased third-party on-site monitor, Pneumatic and Hydraulic Co., ensures the timely delivery of compliant, carefully tested control systems.

S.S HUSSAIN & SONS

3rd Party Installation Services We Offer

S.S HUSSAIN & SONS

Functionality Testing

  • Periodic checks to confirm vendor progress reports
  • As needed, pictures of the progress
  • Analysing vendor purchase orders to check for significant lead times
    • Check the project purchase order for compliance.
    • Examine the RFQ requirements
    • Examine the AFC (Approved for Construction) drawings.
    • Review (if necessary) the vendors’ quality control manual Reports on Material Tests
    • Review test equipment calibration certificates.
    • Review the Special Procedures for the Control Panel.
    • (If necessary, review) Procedure for Control Panel Preservation, Packaging, and Shipping
    • Make that electrical equipment complies with the assigned electrical area categorization
    • Visually evaluate the surface for imperfections, dimensional compliance, and surface polish.
    • Verify that the control panel name tags follow the General Arrangement drawings by looking at them.
  • If available, review the SAFE chart or the cause-and-effect paper to ensure compliance.
  • Verify that the appropriate field simulations are in use.
  • System of full-cycle controls.
  • Check the consistency and integrity of the control system.
  • Any “shipped loose" products should have the part number, quantity, and condition checked.
  • Make sure the compression/gland and NPT connections for the system’s hydraulic and pneumatic connections are leak-free.


Installation CV available by request.